Reception return: two depths
The plan shows a 900mm return; the setting-out excerpt reduces it to 720mm without a linked decision.
Fit-out coordination for small project teams. Track the conflicting information, responsible role and next handover before a question becomes an assumption.
Fictional fit-out / illustrative coordination register
Your handover note 0The plan shows a 900mm return; the setting-out excerpt reduces it to 720mm without a linked decision.
The floor plan and furniture overlay use opposite hinge positions beside the same storage bank.
The ceiling excerpt has four fittings; the electrical excerpt has three offset fittings and no matching switch reference.
The asset index calls the extract unit EX-01; the supplied manual cover identifies EX-02.
The elevation assigns P-01 to the whole wall; the finish schedule splits the lower zone to P-02.
No issues match those filters. Reset the filters to return to the full register.
Open an issue, compare the two excerpts and keep its exact outstanding question in your note. A handover note records what needs coordination; it does not close the issue.
How we structure coordination